Approved design and changes
Use the latest approved revision on site. Track routing or product changes with decision records and the required technical review.
Review fire-protection installation against approved designs, equipment documentation and acceptance criteria, tracking nonconformities through recorded close-out.

Site supervision and quality control (QA/QC) management
Track fire-protection installation quality from material selection to test records. Özkartay provides site review under a defined supervision and quality-control scope, including projects installed by another contractor. Report findings, owners and close-out evidence in a clear tracking process.
01
Set inspection points alongside project scope and contractor responsibilities.
Review approved drawings, specifications, material lists and the programme. Define inspection frequency, witnessed tests and points requiring verification before work proceeds.
Match delivered makes / models, dimensions, agent compatibility and approvals against the approved list. Do not treat substitutions as equivalent without technical approval.
Review routing, hangers and supports, device positions, maintenance access and clashes within scope. Record differences between design and site conditions.
Report each finding with location, technical basis, owner and target date. Responsible project parties review corrections, and completed work is rechecked.
Witness tests within scope and review measurements and acceptance records. Match open items and as-built drawings to the handover package and report close-out status.
02
Quality control is useful when the evidence for closing a finding is clear.
Use the latest approved revision on site. Track routing or product changes with decision records and the required technical review.
Quality assurance establishes plans and responsibilities; quality control records material, workmanship and test findings. Bring both together through close-out tracking.
Define test methods and acceptance criteria before execution. Passing one test does not establish verification of other untested systems.
Distinguish inspection, contractor delivery and design-approval authority within the contract. Report open items, conditional acceptance and completed verification separately.
03
Coordinate inspection with construction sequencing and work that becomes inaccessible later.
04
Scroll the table horizontally to view every column.
| Record | Content | Tracking purpose |
|---|---|---|
| Inspection plan | Scope, inspection points and owners | Site programme |
| Material / installation observations | Location, photographs and technical basis | Design conformity |
| Nonconformity list | Correction, owner and close-out evidence | Open-item management |
| Test and handover review | Measurements, drawings and remaining work | Acceptance preparation |
Supervision and QA/QC provide a defined project review scope. They do not replace formal product certification or authority acceptance; those approvals follow their authorised processes.
Site quality control includes verifying corrections as well as finding deficiencies. Share the approved design, programme and contractor scope to establish the inspection and close-out plan.